Galvanized Construction Pin Lock Scaffolding

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-13 02:24

  • Browse the number:

    157

Send an inquiries
Company Profile
QINGDAO JINGCHENGHUI MACHINERY AND TECHNOLOGY COMPANY LTD
Contactaixin:

jingchenghui(Ms.)  

telephone:

Arrea:

Beijing

Address:

Xiaoxizhuang Village, Jiaodong Street, Jiaozhou, Qingdao, Shandong, China (266100)

Website:

http://jingchenghui.enhesh.com/

Product details

Model Number: JCH-RS Brand Name: JCH Key Specifications/Special Features: GALVANIZED CONSTRUCTION PIN LOCK SCAFFOLDINGDESCRIPTIONPIN LOCKis a fast-erectingmetal modular scaffolding system made of galvanized steel. Pin Lock scaffold system can be used for all forms of access and support structures in the building and construction industries, shipbuilding, offshore construction and industrial maintenance.Galvanized Pin Lock Scaffolding Standard
Use: The standard bears the loads from the scaffold down to the earth, providing vertical support for the scaffolding. The standard has rosettes at 50 cm interval, a spigot on the top and drilled holes at both ends.
Finish: Hot dipped galvanized
Sizes: 500mm/1000mm/1500mm/2000mm/2500mm/3000mm

Galvanized Pin Lock Scaffolding Ledger
Use: Theledgers in several lengths are used as horizontal supports for loads and planks. Ledgers are also used as guard rails.
Finish: Hot dipped galvanized
Sizes:500mm/730mm/1000mm/1090mm/1200mm/1500mm/1570mm/2000mm/2070mm/2500mm/ 2570mm/3000mm/3070mm;other sizes could be offered upon request


Galvanized Pin Lock ScaffoldingBay Brace
Use: Bay braces are used for lateral bracing, increasing stiffness of the scaffold. Bay braces can also be used as guard rails in conjunction with the stair system.
Finish: Hot dipped galvanized
Sizes:730x2000mm/1000x2000mm/1090x2000mm/1200x2000mm/1500x2000mm/1570x2000mm/ 2000x2000mm/2070x2000mm/2500x2000mm/2570x2000mm/3000x2000mm/3070x2000mm; other sizes could be offered upon request

PACKAGING & SHIPPING
All Pin Lock gears are stocked in scaffold racks according to JCH Product Packing Guide:Standard---90PCS Per Rack,Ledger---150PCS Per Rack,Brace---150PCS Per Rack etc.
We can help arrange shipment and have the gears delivered to the closest port near you.

DELIVERY
Our factory is located in Qingdao, which has the biggest port in North China. Our current lead time for regular scaffold is approx. 35 days after order confirmation and will be adjusted based on specific sizes and quantities.

PAYMENT
T/T payment, 30% deposit, rest against the copy of B/L; L/C acceptable
Shipping Information:
  • FOB Port: Qingdao
  • Lead Time: 20 - 40 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe