Product details
Model Number: CJD-30KW
Brand Name: ZONHAN
Key Specifications/Special Features:
Operation method:1) Firstly, check whether all components are completed and the intake of penstock is blocked. 2) Then check whether the runner of turbine can be easily rotated, and rotated in by hand to ensure the voltage meter has readings (put the output switch in OFF position).3) For the first starting, the output switch should be put in the voltage-stabilized control position (A), then open the gate to let water out from small to large, observe the readings meter till 230V (380V) or so continue enhancing water volume, the voltage device is reliable if the reading keep still. At this time the load can be connected, then adjust the water volume to hold the output of 230V (380V) or so. Once the stabilizing device break down, put the switch in B, then the voltage of unit will be under manual-controlled, you may follow the next procedure to control by valve.4) During the operation, the load should be kept stable as possible as can be. Don't shut off the load suddenly, or else the high voltage will burn out the rest load, if you must is connect the load, you may decrease water to small volume at first, then disconnect the most part of load when the voltage has dropped to below 380v (you must do as this even you run the unit under the using of voltage-stabilizing device).5) It need only close the valve to switch off the unit when the load has been stable after first operation, the power switch may hold on so that you may adjust voltage up to 230V (380V) directly for next running.
Model Power
Head
Rated of flow
Rotational speed
Install tube diameter
(W)
(M)
(M3/S)
(RMP)
(MM)
CJ-300W
300
12-14
0.003-0.005
1500
50
CJ-500W
500
12-18
0.005-0.007
1500
50-75
CJ-750W
750
14-18
0.005-0.008
1500
75
CJ-1.5KW
1500
18-25
0.008-0.011
1500
125
CJD-1.5KW
1500
15
0.012-0.018
1500
125-150
CJ-3KW
3000
25-35
0.015-0.019
1500
125-150
CJD-3KW
3000
18-20
0.018-0.030
1500
150
CJ-6KW
6000
28-35
0.030-0.038
1500
150-200
CJD-6KW
6000
18-20
0.038-0.050
1000
200
CJ-10KW
10000
30-38
0.040-0.050
1500
200-250
CJD-10KW
10000
25-30
0.050-0.060
1000
200-250
CJD-12KW
12000
28-35
0.050-0.060
1500
200-250
CJD-15KW
15000
30-40
0.060-0.070
1500/1000
200
CJD-20KW
20000
30-45
0.060-0.100
1500/1000
250-300
CJD-30KW
30000
38-45
0.090-0.120
1500/1000
250-300
Shipping Information:
- FOB Port: Shanghai
- Lead Time: 20 - 35 days
Main Export Markets:
- Central/South America
- North America
- Western Europe